INDUSTRIAL PLANT PIPING ERECTION & COMMISSIONING
Some of the notable piping projects executed by sara are
| Client & Location | Description |
|---|---|
| M/s SBQ Steels Ltd. Gundur, Andhra Pradesh |
45x2 MW CCP Project; Carried out HP, LP steam utility piping, D.M Water make up tank, etc. |
| M/s Triveni Turbine Ltd. Bangalore |
Main steam line and other utility steam pipe line for TTL New Turbine Test Bed plant |
| M/s Sakseria Bhiswan Sugar Mill Bhiswan, Sitapur District, U.P |
HP and LP Turbine Piping for 32 MW Cogeneration Project |
| M/s Khemani distillery Daman |
Erection of exhaust steam and other utility piping |
| M/s Philips Carbon Black Ltd. Mundra, Gujarat |
Main steam and other steam line for 8 MW Power plant (Unit II) |
| M/s Covalant Laboratory Ltd. Madak, Telengana |
Main steam and other steam pipe line for 3.7 MW Power Plant II |
| M/s Chemplast Sanmar Mettur, Unit-II, III, IV |
Main steam pipeline from existing power plant to plant IV |
| M/s Thirumalai Chemicals Ltd. Ranipet, Tamil Nadu |
Steam line and other utility pipe line for plant expansion |
| M/s Chamundeshwari Sugars Ltd. Unit II Chanrayapatna, Hassan District, Karanataka |
T.G. bleed extraction steam line, cooling water line for 20 MW Cogeneration plant |
| M/s. 21 Century Sugars Latur, Maharashtra |
T.G.Bleed extraction exhaust steam line for 32 MW Cogeneration Project |
| M/s EID Parry Sankili |
Distillery Piping for their plant expansion |
| M/s JK Paper, Sirpur Paper Mill Sirpur |
Main steam, Bleed and extraction line for 20 MW CPP |
| M/s ATG Tyre Tirunelveli |
Steam and Process Piping for Plant expansion |
| M/s Hyundai Motors India Pvt Ltd Hyundai Plant |
Steam and Utility boiler piping for relocation of boiler |
| M/s EID Parry Bagalkot |
Distillery Piping for their plant expansion |
| M/s. 3F Oil Palm Limited Ayyavaram, AP |
Main Steam piping from Boiler to Turbine |